AI-generated
AI-generated
BUILDING THE FUTURE
Morooka solutions for power line construction
Grid expansion in Germany
8
Major Projects
17,000
kilometers of transmission grid
650+
Billion Euros
1
Japanese global market leader
8
Major Projects
17,000
Kilometers of transmission network
650+
Billion Euros
1
Japanese global market leader
Morooka machines
are the key to the world's largest underground cable project.
AI-generated
Rubber Track Technology
for project success
Morooka machines enable efficient grid expansion in compliance with construction regulations. Find out how …
Power line construction in Germany
Overview
Power line construction in Germany
Overview
AI-generated
The Project
SuedLink brings wind power from the north to the south—700 km, completely underground.
The Problem
95% of the route runs over arable land. The soil must not be compacted—otherwise, agriculture is not possible.
The Machine
The Morooka tracked dumper transports heavy loads while remaining lightweight. It can be deployed almost anywhere.
AI-generated
The cornerstone of energy security
Suedlink is one of eight flagship projects of the German Energy Transition, significant for all of Europe.
By 2028, two extra-high-voltage lines will be constructed along Germany’s North-South corridor, with a total length of 700 km.
They will supply the country’s industry and metropolitan areas with predominantly climate-friendly electricity from renewable sources.
Seven more major corridor projects will follow this model. Together with SuedLink, they will expand Germany’s transmission grid by 17,000 km by 2045.
This makes the initiative one of Europe’s most important grid expansion projects.
SuedLink corridor section







From sky to underground
Unlike in the past, the new energy backbone routes direct current lines underground.
A real win for the landscape and sustainability—but a major construction challenge…

Soil protection as a core principle
Soil protection as a fundamental principle
A major portion of the new routes runs across farmland. This sensitive terrain poses significant challenges for construction contractors. It is not just a matter of speed and volume, but also of meeting strict soil protection requirements. While the approach to this problem is creative in many places, it is rarely efficient…
AI-generated
AI-generated
The 700 km steel plate problem
To comply with ground pressure limits, many contractors rely on what they know: steel plates.
While this solution distributes the weight of operating machinery, it introduces extra effort and new challenges on site:
- Enormous material costs
- Transportation and storage
- Difficult to drive on in rain or frost
For a project of this magnitude, where construction progress cannot be delayed by weather conditions or site requirements, there is only one true fundamental solution: selecting the right machinery.

AI-generated
The Morooka Effect
Where steel plates reach their limits, Japanese engineering offers a technological answer:
The large ground contact area, rubber tracks, and track rollers of Morooka machines, along with a 360° rotating upper structure, make a noticeable difference in power line projects like SuedLink.
- No construction site modifications
- No additional materials
- No unnecessary maneuvering
AI-generated
Morooka Machinery Solutions
Machine solutions from Morooka
A machine that delivers performance economically, ecologically, and safely.
Economical
No steel plate management
Transport material directly to the job site –
without additional logistics effort.
360° rotating upper structure
Precisely dump material sideways – without maneuvering or turning.
Ecological
Low ground pressure
Protects sensitive soils and reduces soil compaction.
Track rollers
Optimal weight distribution – even on uneven terrain.
Safety-Focused
360° bird’s-eye view camera
All-round visibility for more safety on the job site.
Precise joystick control
Ergonomic and controlled work even in confined spaces.
Rubber tracks instead of steel plates
No risk of slipping on wet or frozen steel plates and always ready for use.
Specialized
machine & All-rounder
Special machine & All-rounder
Contractors who rely on Morooka rubber track dumpers in power line projects benefit from measurable performance effects.
An investment in the right machine beats steel plate chaos and compliance limbo by far.
And even beyond comparable projects, the Morooka tracked dumper proves itself as a tried-and-true all-rounder – in construction projects with heavy earth-moving work and on challenging terrain, operating in wind energy, forestry, pipeline construction, or disaster relief.
Investing in a Morooka machine extends well beyond the power line projects.
Discover our areas of application
The problem is known,
the solution is proven.
Are you ready for performance in a growing market?
Germany is building the largest power grid in its history – and the critical factor is the ground over which every kilometer runs. Those who protect it build faster, cheaper, and safer. Those who rely on steel plates pay double.
With eight major projects and thousands of kilometers ahead, the decision for the right machine is now…
AI-generated
Let's talk about how Morooka drives your job site forward.
Jürgen Bergmann,
Sales Manager
The problem is known,
the solution is tested.
Are you ready for performance in a growing market?
Germany is building the largest power grid in its history – and the critical factor is the land over which each kilometer runs. Those who protect it build faster, cheaper, and safer. Those who rely on steel plates pay double.
With eight major projects and thousands of kilometers ahead, the decision for the right machine is now…
Let’s talk about how Morooka advances your construction site.
Jürgen Bergmann,
Sales Manager
AI-generated


